Change of Use

Change of Use Plans & Pricing

Professional architectural drawings and planning applications for change of use projects across London. Commercial to residential, retail to office and more.

Fixed-Fee Quotes No Hidden Costs Free Consultation

Change of Use Plans & Planning Applications

Change of use applications involve converting a property from one use class to another. These projects require specialist planning knowledge, and our team has extensive experience with local authorities across London.

Change of use architects in London typically charge £2,000–£6,000+ for planning drawings. Our fixed-fee packages start from just £900 + VAT.

Building Regulations

Request a Quote
  • Full building regulation drawings
  • Technical specifications
  • Expert building control advice
  • Please request a quote for building regulations

Structural Design

Request a Quote
  • Full structural calculations
  • Structural design drawings
  • Produced by chartered structural engineers
  • Please request a quote for structural design

What Our Clients Say About Us

What's Included

Every package is designed to give you everything you need, with no surprises.

A full 3D scan of your property using advanced Lidar technology, capturing every measurement with precision. This forms the foundation of your architectural drawings.
Your project designed in full 3D so you can visualise exactly how it will look. Includes floor plans, elevations, sections and 3D renders with free design meetings.
We prepare and submit your planning application, including all required forms, documents and drawings. We liaise with the planning officer throughout the process.
We work with you until the design is exactly right. Unlimited changes within the agreed scope means no surprises and no extra charges for design tweaks.
Full structural calculations produced by our chartered structural engineers covering foundations, steelwork, lintels and any load-bearing elements.
Detailed technical drawings showing construction details, insulation, drainage and fire safety to satisfy building control requirements.
Our Process

Our Process Explained in Six Easy Steps

From your first enquiry to submission and support, our process is designed to keep your project clear, organised and moving forward.

01

Your 3D Site Survey

An appointed surveyor will carry out a full measured survey of your property, noting down all your desired requirements for your proposal.

02

Drawings Initiated

Your project is allocated to one of our architectural designers who will design it from the ground up, taking into account all your needs.

03 1 2

You Review It

Your first draft is typically ready in 7 working days, and within 10 at the latest. Review the designs, send us any changes, and we’ll finalise your drawings for submission.

04 APPROVED 6-8 weeks

Submission & Decision

Your plans will be submitted strategically for swift council approval. Expect a decision in 6–8 weeks. We handle any required changes for free.

05 RSJ 254x146 2400mm 12.5 kN/m CALCULATIONS M = wL²/8 = 12.5 × 4²/8 = 25.0 kNm σ = M/Z = 25.0/432 = 57.9 N/mm² ✓ PASS

Technical Design

Once plans are approved, our Structural Engineers and Architects will manage the Structural Design and Building Regulations compliance. You can also get construction quotes from us to compare.

06

Construction

If you decide to build with us, we arrange a detailed consultation to finalise your requirements and ensure everything aligns perfectly with your vision.

Ready to start your project?

Get a Free Consultation

Why Choose Us

Why Choose Us as Architects in London?

From planning strategy to technical design and construction support, we combine practical experience with clear communication at every stage.

01

Proven Track Record

Our team brings extensive experience working with local authorities across London and beyond. From Lambeth to Hillingdon, we understand how different councils approach planning decisions.

02

3D Visualisations

We moved beyond 2D drawings years ago. Our 3D designs let you see the before and after of your property long before construction begins, so there are no surprises.

03 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 15 16 17 18 19 22 23 24

On Time, Every Stage

A dedicated project manager keeps your project on track with clear communication at every milestone. We maintain one of the fastest turnaround times in the industry.

04 FREE

Free Initial Advice

Our guidance goes well beyond planning and architecture. We support you through the entire journey, from initial concept through to construction and completion.

05 EXT 4.5m 3.2m Architect Engineer Proj. Manager

Collaborative Approach

Structural engineers, architectural designers and construction managers work side by side from day one, keeping your project coordinated, efficient and on brief.

06 254mm M = wL²/8 σ = M/S ✓ PASS

Industry Experts

With thousands of completed projects across our team, we bring deep expertise in residential design, structural engineering and the UK planning system.

Frequently Asked Questions

Common questions about change of use pricing and our process.

A change of use occurs when a building is converted from one use class to another, such as from a shop (Class E) to residential (Class C3). Most changes require planning permission, though some can be done under permitted development rights.
Some commercial-to-residential conversions are possible under Class MA permitted development rights. This applies to certain commercial, business and service uses. We assess eligibility during your consultation.
Prior Approval is a lighter-touch planning process for permitted development changes. The council assesses specific impacts such as transport, flooding, contamination and noise rather than the full range of planning considerations.
Prior Approval applications are typically decided within 56 days. Full planning applications take 8-13 weeks. Design work takes 4-6 weeks before submission. We manage the entire timeline for you.
Yes, in most cases. Converting between use classes typically triggers building regulations requirements for fire safety, structural stability, accessibility and energy performance.
Yes. We regularly design mixed-use schemes combining residential with commercial, retail or office space. These often require careful design to meet planning policy requirements.

Ready to Start Your Change of Use?

Book a free consultation and get a fixed-fee quote for your project. No obligation, no pressure, just expert advice.

Start Your Project

Let's Discuss Your Project

Share your project details and our team will review the scope, provide clear guidance, and come back with practical next steps — no obligation, just honest advice.

How It Works
1

Tell Us What You're Planning

Extension, loft, new build — share your ideas using the form

2

We Review Your Project

Our architects assess your property and project requirements

3

Receive Clear Next Steps

Get a fixed-fee quote and a practical plan to move forward

020 3161 2637 Acton Office
020 7302 3111 Teddington Office
hello@salstan.co.uk Email Us
existing proposed
Your Project Details

Fill in what you can — we'll follow up with anything else we need.

Fixed-Fee Quotes
London-Wide Coverage
Planning & Building Regs
Clear Next Steps
"